The Navigator News

Under Construction: Expanded Student Center to open fall 2019

Back to Article
Back to Article

Under Construction: Expanded Student Center to open fall 2019

Zoë Donovan, Editor-In-Chief

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






Lakers are sure to have noticed the construction that’s been taking place throughout the school year. At the start of the 2019-2020 Fall Semester, students can expect to see the expansions to the Luther Student Center completed. This expansion will see several key campus resources relocated.

The college is hoping to provide a sort of one-stop shopping experience for students in the Luther Student Center. TriO, Student Life, Counseling and Admission services will be moving to the new section of the Student Center.

Meanwhile, the Campus Nurse’s office and Bookstore will move to where Admissions is currently located. The Police Department will also be moving into the Student Center Building, providing a much closer headquarters to campus.

Lastly, Financial Aid and Accounting will be located side by side to provide easier access to students.

The new student center will feature an open lab space and new televisions and a new lounge area for students to utilize for studying and socializing. This new space is meant to invite students to hang out on campus and be involved. Lake Land was able to begin this construction when a bond opened up. A 16 million dollar bond was approved by the board and finalized in February of 2018 to finance the project.

By utilizing the bond Lake Land was able to start this project without impacting taxpayers. A project such as this has been something that the college has been pursuing for almost 20 years. The previously planned designs saw almost 52,000 square feet of expansion. However, due to state cutbacks in funding Lake Land was unable to do this until now, and on a much smaller scale. The current plans feature 18,200 square feet, a great scale back from the original 52,000. The idea wasn’t to simply update an old building but to create a new space for students to engage. The Luther Student Center expansion will be entirely geothermal and will receive a new HVAC system.

Facebook Comments
Print Friendly, PDF & Email
About the Writer
Zoë Donovan, Editor-In-Chief


Zoë is the Editor-In-Chief of The Navigator News. She started working for the Navigator in August of 2017.  Zoë is an English major with a love of...

Navigate Left
  • Under Construction: Expanded Student Center to open fall 2019

    News

    Get to know the SGA sophomore delegates

  • Under Construction: Expanded Student Center to open fall 2019

    News

    LLC rated on best online community college in Illinois list

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Students recognized at awards banquet for academic success

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Graduation: Have you finished school or has school finished you?

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Transfer Resource Room

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Lake Land welcomes new VP of Student Services: Beth Gerl

  • Under Construction: Expanded Student Center to open fall 2019

    News

    A conversation with the dead: Psychic comes to campus

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Sarah Bush brings mobile mammography to campus

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Laker Nest looking for Student Input

  • Under Construction: Expanded Student Center to open fall 2019

    News

    Please welcome your new Student Trustee and SGA Sophomore Delegates

Navigate Right

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






A Lake Land College Student Publication
Under Construction: Expanded Student Center to open fall 2019